| ====== Projects ====== | ====== Projects ====== | ||
| ===== PR-043: Software for Double Clutch Transmission ===== | ===== PR-043: Software for Double Clutch Transmission ===== | ||
| - | April 2022 - //ongoing// | + | April 2022 - June 2025 (39 months) | 
| ==== Description ==== | ==== Description ==== | ||
| - | The existing project  | + | The existing project  | 
| - | Support of the FuSa team in Berlin and Gifhorn  | + | In close cooperation with the functional safety teams in Berlin and Gifhorn, I was responsible for the following  | 
| - | * Change request driven coding according to Fastlane process | + | |
| - |   * SYS.2 Requirements analysis/ | + |   * SYS.2 - Technical Safety Concept: Review  | 
| - |   * SWE.1 Requirements  | + |   * SWE.1 - Software Safety  | 
| - |   * SWE.2 Software  | + |   * SWE.2 - Software  | 
| - |   * SWE.3 Software  | + |   * SWE.3 - Software  | 
| - |   * Task tracking  | + |   * SWE.3 - Implementation (handwritten code): Code implementation according to software design specifications, | 
| + | |||
| + | The project was carried out in two phases, each with a binding SOP milestone. | ||
| + | |||
| + | Activities in Phase 1: SOP-Oriented Development with Fastlane Process | ||
| + | |||
| + | * Change-driven coding according to the Fastlane process for rapid availability of the firmware | ||
| + |   * Downstream  | ||
| + |   * Task tracking  | ||
| + | |||
| + | Despite a pandemic-related project delay in the early phase, the SOP milestone was reached on time. | ||
| + | |||
| + | Activities in Phase 2: Agile Further Development and Process Optimization | ||
| + | |||
| + | * Further development of the transmission software under ASPICE-compliant conditions in a change-driven environment | ||
| + | * Participation in 2-week sprints, with release cycles spanning 4 to 5 sprints, each preceded by an analysis sprint | ||
| + | * Contribution to lessons-learned workshops and process refinement measures | ||
| + |   * Contribution to and review of the architecture, | ||
| + | * Revision of the model structure in the UML tool for process-related separation and improved navigability | ||
| + | * Conversion from a centralized to a distributed version control system (including migration of derivative-specific sharing structures) | ||
| + | |||
| + | At the time of my departure from the project, the safety case for the SOP had just been completed. | ||
| ==== Summary ==== | ==== Summary ==== | ||
| |Key|PR-043| | |Key|PR-043| | ||
| |Order|UV-27-049| | |Order|UV-27-049| | ||
| - | |Duration|//ongoing//| | + | |Duration|April 2022 - June 2025 (39 months)| | 
| |Project|Software for Double Clutch Transmission| | |Project|Software for Double Clutch Transmission| | ||
| |Customer|// | |Customer|// | ||
| |Industry Sector|Automotive| | |Industry Sector|Automotive| | ||
| - | |Role / Responsibility|Software Safety Requirements, | + | |Role / Responsibility|Software Safety Requirements, | 
| - | |Software / Tools / Methods|Enterprise Architect (Sparx), Tasking C Compiler (Tasking), Eclipse CDT (Eclipse Foundation), | + | |Software / Tools / Methods|Enterprise Architect (Sparx), Eclipse CDT (Eclipse Foundation), Visual Studio Code (Microsoft), | 